
Engineering & management
Furnace &
Refractory Academy
Study the decisions behind furnace design, capital investment and lining life through industrial cases, worked calculations and published research.
Explore the curriculumChoose a reading path
Featured case · Schwelgern BF2
What ends a lining campaign?
A ceramic cup lasted about nine years. The furnace went on for nearly twenty-one. Follow the evidence from one part of the hearth to the decision to reline the whole vessel.
Read the case studyCurriculum
Fields of study
Five subjects · Ten lessons
Fundamentals
Trace a heat flow or a lining history before interpreting the next plant reading.
How does a lining behave?
Capital projects
Examine the production and construction assumptions behind a reline decision.
What are we committing the plant to?
Campaign performance
Connect hot hours, tonnes delivered and energy use to the asset’s economics.
What did the campaign deliver?
Damage and diagnosis
Read temperature histories, autopsy findings and the limits of each observation.
Why did this zone wear first?
Testing and research
Follow a measured property through the calculation to the decision about a plant trial.
What does the experiment establish?

From the laboratory
When the balance gives the wrong ranking
Two metallic liners lose different masses in an abrasion test. Convert the losses to volume, and the ranking reverses. Would that change your choice for a plant trial?
Explore the worked example