Capital projects and operating assets
For a single furnace or a fleet, we connect the investment case to maintenance decisions. The expected campaign life, availability and outage cost used to approve a project become reference points for the operating team.
Discuss a furnace projectCAPEX | Feasibility through commissioning
Feasibility and capital prioritization
Compare repair, reline and replacement against asset condition, outage windows and production demand. Test how campaign life, downtime and installation cost affect the return.
You receive a ranked capital plan and a comparison of lifecycle cost, payback assumptions and the risks that could change the decision.
Furnace and lining design review
Review drawings against duty, geometry, bath and slag exposure, insulation, joints, anchoring, access and maintainability. Identify the interfaces that need resolution before procurement.
You receive a marked-up design review, open-issues register and acceptance criteria for each critical zone.
Heat-transfer simulation
Compare lining options at steady state and through heat-up or cooling. Use agreed conductivity data, geometry, boundary conditions and operating history. Check how uncertainty affects the result.
You receive predicted shell temperatures, heat loss and temperature profiles by zone, with assumptions, sensitivities and a recommendation on thickness or insulation.
Refractory selection and qualification
Match the working lining, backup and insulation to chemical attack, abrasion, thermal cycling and installation constraints. Compare candidate grades against the material already in service.
You receive a zone-by-zone material schedule, technical specifications and a qualification plan for substitutions.
Manufacturer negotiation and procurement
Prepare the technical RFQ, normalize supplier bids and support negotiations on grade equivalence, inspection, lead times, traceability and warranty terms. Your team approves the commercial award.
You receive a comparable bid sheet, documented exceptions and a negotiation brief showing price, delivery and lifecycle trade-offs.
Installation, commissioning and handover
Agree inspection hold points with the contractor. Document installation, curing and dry-out, then verify start-up conditions against the acceptance criteria with the site team.
You receive an inspection record, a list of outstanding items and a commissioning baseline for the operating team.
OPEX | Maintenance, cost and performance indicators
Operating cost and KPI management
Track refractory cost per tonne, furnace availability, energy per tonne and campaign life against the investment case. Review deviations with operations and maintenance before attributing a change to the lining.
You receive a site scorecard with baselines, review intervals and triggers for inspection, repair or reline planning.
Campaign monitoring and failure analysis
Map wear and hot spots by zone. Reconcile repair history and operating events with visual inspections, thermal surveys and post-mortem samples. Identify the evidence that would distinguish likely causes.
You receive a condition baseline, an inspection schedule and a repair, reline or operating recommendation with its limits.
Metallurgical analysis and operating trials
Reconstruct heats from plant records, feed, slag and metal assays. Investigate foaming, endpoint control, losses, energy use and lining attack. Compare operating changes under agreed constraints.
You receive a process baseline and mass or energy balance where data permit, followed by a trial plan with sampling points, success measures and stop criteria.
On-site operator training and furnace rounds
Join crews on their rounds. Ask where wear first appears and what gets missed at shift change. Use examples from their own furnace to practise recognizing deterioration, recording it consistently and knowing when to call maintenance.
You receive a shift checklist written with operators, photographs of site examples and a handover exercise for crew leads.
Putting refractory practices into daily use
Choose one recurring issue with operators and supervisors. Trial a change on one shift, hear what made it easier or harder, and coach the other crews on the agreed practice. Compare wear and downtime under similar operating conditions.
You receive a site-approved work instruction, a named owner and a follow-up review to decide whether to keep, adapt or stop the change.
When is a full reline worth the outage?
Compare a targeted repair with a full reline using site costs, outage hours and expected tonnes before the next intervention. At commissioning, record the lining condition and the assumptions behind the choice. Revisit the decision with actual wear, unplanned downtime and cost per tonne before committing the next round of capital.